On-Site
Contractor
Middle Management
North Carolina, North Carolina, United States
About Mercury Z
About the job
Role Summary
We are looking for a Fiber Construction Manager to join our team who can lead fiber placement and inside plant installation on data center campus projects. The work covers high-count fiber (3,456-count and up, including pre-terminated cable) placed through underground duct and manhole systems between buildings, then spliced, tested and connected inside the data center. Major materials are typically furnished by the owner; the contractor provides labor, tools, equipment and minor consumables.
The ideal candidate will be a hands-on leader with data center or hyperscale experience who can run crews, protect pre-terminated cable, and deliver clean test and closeout documentation. This role requires national travel, with an initial deployment in North Carolina; per diem and travel logistics are provided.
Responsibilities
- Run each project from mobilization to closeout: cable placement, splicing, testing and inside plant work.
- Lead and schedule several crews, including pulling crews, ribbon splicers, testers and rack-and-stack techs, plus subcontractors.
- Oversee heavy cable placement through ducts and manholes, including duct proofing, clearing obstructions, dewatering and tension recording on every pull.
- Protect pre-terminated cable, which can't be cut, by managing slack storage, reel handling and labeling.
- Oversee mass ribbon fusion splicing, cable end prep, bidirectional OTDR testing, and MPO/MMC loss and polarity testing.
- Manage inside plant installation: racks, vertical cable managers, fiber shelves and panels, and firestop.
- Own the daily progress reports, unit-production tracking, test documentation, as-builts and closeout package.
- Enforce site safety, including confined-space entry, fall protection, badging and data center security rules.
- Be the day-to-day contact for the client's project manager and inspectors.
Requirements
- 7 or more years in fiber construction, with at least 3 years leading crews as a foreman, field supervisor or project lead.
- Hands-on experience with high-count cable (864 to 3,456-count or more) and mass ribbon splicing.
- Data center or hyperscale campus experience, plus outside plant underground work.
- References for placing pre-terminated, high-count cable on data center campuses.
- Strong grasp of OTDR and loss testing, reading test reports, and acceptance criteria.
- Experience tracking unit-priced or production work.
- OSHA 30, plus confined-space and fall-protection training. First Aid certification required; CPR preferred.
- Comfort with splice diagrams, route prints and as-built documentation.
- Valid driver's license, able to pass a background check and drug screen, and willing to travel and stay on site.
Nice to Have
- FOA CFOT or CFOS, or BICSI.
- Experience working with EXFO or VIAVI test gear and Fujikura ribbon splicers.
- Your own crew or a network of splicers you can bring.
Preferred Skills
Fiber Construction
Crew Leadership
Mass Ribbon Fusion Splicing
OTDR Testing
Underground Duct and Manhole Placement
Data Center Fiber
Unit Production Tracking
As-Built Documentation
OSHA 30 Site Safety
Fujikura Ribbon Splicers
EXFO / VIAVI Test Gear